Parts list
Each appliance comes packed in a box or several boxes. The boxes contain the various components necessary for a successful installation. The appliance box contains the following components:
 
1 Head unit with RAID drives preinstalled
1 Rail kit
2 Power supply cables
2 Ethernet cables
1 External SAS cable
1 Product Activation Information envelope containing the product license
1 Quick Start Guide
1 JBOD Units with 48 drives preinstalled
1 Label listing serial numbers of all JBODs for this system. This label appears on top of the head unit and was attached to the outside of the head unit’s box. Use this label to sort and connect the proper JBODs to the head unit.
SFP transceivers (if ordered)
Before installing, ensure you received all of the parts required for your system.